top of page

ALL PHOTOS COURTESY OF MORTENSON CONSTRUCTION

NEWS FEED:

The news feed will contain all completed work with the date of completion.  Each item will have a link that will display the finished project.

[04-12-2017] ABET Student Reflection

[04-12-2017] Final Reflection

[04-06-2017] Final Presentation

[04-03-2017] Final Report

[03-29-2017] Presenation Example Slides

[03-29-2017] Presentation Outline

[12-09-2016] Approved/Updated Proposal

[11-28-2016] Proposal

[11-09-2016] Technical Report 3

[10-31-2016] Abstracts Posted on Display

                       Board

[10-24-2016] Building Abstract Completed                          and Posted to CPEP

[10-19-2016] Building Statistics Part 2

                       Posted to CPEP

[10-17-2016] Technical Report 2

[10-03-2016] Building Statistics Part 1

                       Posted to CPEP 

[09-16-2016] Technical Report 1 Completed

[09-16-2016] Student Bio Posted to CPEP

                       and reviewed

[09-14-2016] Project Initiation Checklist

                       Part 2

[09-12-2016] CPEP Full Menu and Home

                       Page Draft

[09-07-2016] Career Fair Hosting

[09-07-2016] Resume Submitted for Career

                       Fair

[09-04-2016] Updated Master Checklist

[09-03-2016] Attended CPEP Seminar

[09-01-2016] Turned in Project Initiation                              Checklist Part 1

[08-23-2016] Mailed AE Dept. thank you

                        letters to contacts

[08-23-2016] Sent personal emails to          

                        contacts

[08-17-2016] Obtained Project

                        Documentation 

[07-21-2016] Owner Permission Received

INTRODUCTION:

Senior thesis is a year long project where a student analyzes a building that has been constructed, or is currently under construction.  Each of the options within the AE program will focus on certain aspects of the building relating to their option.  The project I will be focusing on is the addition to the Intramural Building on the Penn State Campus at University Park.  The addition will be the third phase of the building.  The addition will be mixed use, adding an indoor turf field,  a rock climbing wall, table tennis, various lounges and several offices and appointment rooms.  All information from the project, as well as myself will be found on this website.  This includes all reports, drawings, personal information and information on the parties involved on the project.   Please feel free to look around and to contact me with any questions.   

ABOUT CPEP:

The Capstone Project Electronic Portfolio (CPEP) is a web‐based project and information center. It contains material produced for a year‐long Senior Thesis class. Its purpose, in addition to providing central storage of individual assignments, is to foster communication and collaboration between student, faculty consultant, course instructors, and industry consultants. This website is dedicated to the research and analysis conducted via guidelines provided by the Department of Architectural Engineering. For an explanation of this capstone design course and its requirements please click for more information.

bottom of page